Over May 22 and 23, 2019 , the very old felt lining the concrete wall was stripped and replaced by artificial grass, while bowls continued, and the old plastic bottom lining was replaced by black rubber with pyramids
On May 24th 2019 the irrigation system controller and the 4 pop-up sprinkler heads were replaced with up do date equipment, which we hope will give reliable watering of the Green